References

Design and construction of the complete spraying system, electrical engineering, control unit, distribution box, pumps, etc.

Modules:

+ M5A Wet Handling Track
+ M3 Test Hills 10% to 40%
+ M2B Ceramic Lane
+ M9 Infrastructure Storage Basin 1+2
+ M2 Dynamicplatform
conti2
hmp_komplettlösungen_01
hmp_komplettlösungen_01
conti3
conti9
conti4
conti7a
conti6
conti8

The Experience Center is equipped with: hydraulic car-skid plate, computer-controlled water obstacles, overflow gutter, sprinklers, control unit, distribution box, pumps, LED-speed measurement.

Project area:  25.000 m²

Module A: dynamic surface
Module B: orbital path
m1
m4
m3
m2

ORK – Ovalrundkurs:
The test track is equipped with the patented HMP-Sprinklersystem

d1
d3
d2

BP – Braking Platform with 7 lanes and aquaplaning basin
Design and construction of the complete spraying system, electrical engineering, control unit, distribution box, pumps, etc.

Modules length 200m:

+ CHEQUER BOARD – BP-CHB
+  HIGH FRICTION ASPHALT- BP-HGA
+  CERAMIC TILES – BP-CER
+  BASALT TILES – BP-BST
+  ASPHALT 0.8μ – BP-ASP
+  POLISHED CONCRETE – BP-CON
+  “REG 117” ASPHALT – BP-ASN
+  AQUAPLANE ASPHALT – BP-AQP

z1
z3
z2
z4

The Road Safety Training Center is equipped with:
hydraulic car-skid plate, computer-controlled water obstacles, dry obstacles, overflow gutter, sprinklers, L.L.L.C Long Life Slide Coating, LED-floodlight, LED-speed measurement, instructor cabin
.

Project area:  54.000 m²
Asphalt area:  36.000 m²

Modules:
M1: skid track
M2: orbital path
M3: dynamic surface
M4: handling course 1100m

bodensee 0
bodensee8
bodensee4
bodensee7
bodensee9
bodensee12
bodensee5
bodensee2
bodensee1
bodensee3
bodensee11
bodensee6

Layout and detailed planning. 
The Road Safety Training Center is equipped with:
hydraulic car-skid plate, computer-controlled water obstacles, overflow gutter, sprinklers, slide coating, LED-floodlight, control unit, distribution box, pumps, LED-speed measurement, instructor cabin.

Remote Controled Skid Car

Projekt area: 15.000 m²
Asphalt area: 12.000 m²

Modules:
FT 1: dynamic surface
FT 2: orbital path
FT 3: motorcycle slalom course

w1
w3
w2
CFC

The Road Safety Training Center is equipped with:
dry obstacles, overflow gutter, sprinklers, L.L.L.C Long Life Slide Coating, LED-floodlight, LED-speed measurement, instructor cabin.

Project area: 35.000 m²
Asphalt area: 23.000 m²

Modules:

VÜP 1: area with flexible obstacles
VÜP 2: skid track
VÜP 3: ECO test track
VÜP 4: crossroads with traffic light
VÜP 5: orbital path
VÜP 6: test road
VÜP 7: winding road with sight barrier
VÜP 8: braking area for motor bikes
VÜP 9: curves road
MSP: motorrad slalom parcours

cfcsanem

Track irrigation of the handling course 1200m with HMP trade mark protected adjustable sprinklers.

bosch1
bosch2
bosch3

Track irrigation of the handling course 1100m with HMP trade mark protected adjustable sprinklers.

bosch4
bosch5

The Road Safety Training Center is equipped with:
computer-controlled water water obstacles, hydraulic skid plates for skid control practice, inclines, glide paths, floodlights for the entire training area and speed displays for individual areas.

Project area: approx. 50.000 m² (approx. 12.35 acre)
Asphalt area: approx. 30.000 m² (approx. 7.41 acre)

Modules:
FT1 skid track
FT2 orbital path
FT3 incline
MSP motorcycle slalom course

RACC Madrid Download

Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid
Madrid

The Road Safety Training Center is equipped with:
computer-controlled water obstacles, dry obstacles, overflow gutter, sprinklers, hydraulic truck-skid plate, L.L.L.C Long Life Slide Coating, LED floodlight, LED speed measurement, height measurement for trucks, Drive-Over-Scale, instructor cabin.

Project area: approx. 65.000 m²
Asphalt area: approx. 40.000 m²

Modules:
M 1.1: dynamic surface
M 1.2: orbital path
M 2: big hill
M 3: skid track

Selm

The Road Safety Training Center is equipped with:
computer-controlled water obstacles, dry obstacles, overflow gutter, sprinklers, L.L.L.C Long Life Slide Coating, LED floodlight, LED speed measurement, instructor cabin.

Project area: approx. 25.000 m² (approx. 6,18 acre)
Asphalt area: approx. 13.000 m² (approx. 3,21 acre)

Modules:
A: big hill
B: dynamic surface
C: handling course

Kaiserkuhle

Sprinkler system
L.L.L.C Long Life Slide Coating

Bielefeld

The Road Safety Training Centre is equipped with:
computer-controlled water obstacles, hydraulic skid plates for skid control practice, inclines, glide paths, floodlights for the entire training area and speed displays for individual areas.

Project area: 27.550 m² (approx. 6.81 acre)
Asphalt area: 19.100 m² (approx. 4.72 acre)

Modules:
FT1 skid track
FT2 orbital path
VÜ1 parking area with flexible obstacles
VÜ2 curves road
VÜ3 roundabout
VÜ4 crossroads with traffic light
VÜ5 winding road with sight barrier
VÜ6 hill for going/starting uphill

Wien Kagran

Track irrigation of the handling course 1,2 km with HMP trade mark protected sprinklers

Audi Neustadt

Computer-controlled water obstacles, incline section, sliding pavements, speed measurement system, irrigation (overflow irrigation and sprinkler irrigation), MTHP- dry obstacle.
Entire project execution through HMP-Bau GmbH. Planning, bidding procedure (RFQ), awarding of contract, site supervision, permit procedure, commissioning in acccordance with drivers license law (multiphase commissioning in accordance with FSG 4a para.6), acceptance and startup.

Project area: 12.000 m² (approx. 2.99 acre)
Asphalt area: 11.000 m² (approx. 2.72 acre)

Modules:
FT1 skid track
FT2 orbital path
MSP motorcycle slalom course

Feistritz

Computer-controlled water obstacles, incline section, sliding pavements, speed measurement system, irrigation (overflow irrigation and sprinkler irrigation).

Project area: 9.000 m² (approx. 2.22 acre)
Asphalt area: 8.500 m² (approx. 2.10 acre)

Modules:
FT1 skid track
FT2 orbital path
MSP motorcycle slalom course

Spittal Lendorf

Technical equipment exchange of competitor supplied RSTC with state of the art HMP technology (control system, irrigation, speed measurement etc.).
Service and maintenance

Stegenwald

Skid surface, mobile sprinklers, mobile speed measurement

Red Bull Ring

Technical equipment exchange of competitor supplied RSTC with state of the art HMP technology (control system, irrigation, speed measurement etc.).
Service and maintenance
Optimization of operating costs

Bozen
Bozen

The Road Safety Training Centre is equipped with:
computer-controlled water obstacles, hydraulic skid plates for skid control practice, inclines, glide paths, floodlights for the entire training area and speed displays for individual areas.

Project area: approx. 120.000 m² (approx. 29.65 acre)
Asphalt area: approx. 53.000 m² (approx. 13.1 acre)

Modules:
FT1 skid track
FT2 orbital path
FT3 incline
FT4 aquaplaning basin
FT4b dynamic surface
FT5 small hill top
MSP motorcycle slalom course

Marchtrenk

The Safe Driving Centre is equipped with:
computer-controlled water obstacles, hydraulic skid plates for skid control practice, inclines, glide paths, floodlights for the entire training area and speed displays for individual areas.

Project area: approx. 62.000 m² (approx. 15.32 acre)
Asphalt area: approx. 30.000 m² (approx. 7.41 acre)

Module:
FT1 skid track
FT2 orbital path
FT3 incline
FT4 aquaplaning basin
MSP motorcycle slalom course

Lang Lebring

The Safe Driving Centre is equipped with:
computer-controlled water obstacles, hydraulic skid plates for skid control practice, inclines, glide paths, floodlights for the entire training area and speed displays for individual areas.

Project area: approx. 28.000 m² (approx. 6.92 acre)
Asphalt area: approx. 14.000 m² (approx. 3.46 acre)

Modules:
FT1 skid track
FT2/3 incline with orbital path
MSP motorcycle slalom course

Röthis

The Road Safety Training Centre is equipped with:
computer-controlled water obstacles, hydraulic skid plates for skid control practice, inclines, glide paths, floodlights for the entire training area and speed displays for individual areas.

Project area: approx. 41.000 m² (approx. 10.13 acre)
Asphalt area: approx. 20.000 m² (approx. 4.94 acre)

Modules:
FT1 skid track
FT2 orbital path
FT3 incline
MSP motorcycle slalom course

Kalwang

Hydroplane basin, handling course with water obstacles, glide surfaces, speed measurement system.

Project area: approx. 28.000 m² (approx. 6.92 acre)
Asphalt area: approx. 3.000 m² (approx. 0.75 acre)

Modules:
FT4 aquaplaning basin
Handling course with water obstacles

Saalfelden

Renovation of the existing skid track:
Installation of a new sprinkler irrigation and a velocity measurement system.

Murska Sobota

Service, maintenance and update of competitor supplied RSTC

ARBOE

Delivery and mounting of 4 LED speed measurement system

BMW